Адрес: 443022, г.Самара, Садовый проезд, д.3
Телефон / факс: (846) 997-79-68
Main page

About us

     BITAS was established in Samara Russia, in 2005. The primary activity of the company is an equipment production for informational and engineering support of oil- and gas-well constructions.
      The company is a modern industrial complex with a highly qualified staff and powerful manufacturing capabilities. All that help to provide the full cycle of manufacturing: from its design up to post-sale service of the equipment produced.

     The key products produced by BITAS are wireless telemetry systems with the electromagnetic channel of the BTS communication and service drilling control module TM FREGAT-2. The latest BITAS design is a unified wireless telemetry system ABTS-EM used for rotary drilling.
     The wireless telemetry system BTS and ABTS-EM are used for the effective trajectory control of inclined and horizontal boreholes during turbo- and rotary drilling and can uninterruptedly operate on the bottomhole during several days without a routine tripping maintenance.
     The wireless telemetry system BTS and ABTS-EM are used for the effective trajectory control of inclined and horizontal boreholes during turbo- and rotary drilling and can uninterruptedly operate on the bottomhole during several days without a routine tripping maintenance.

The equipment manufactured by BITAS is used for boreholes drilling on oil- and- gas fields in Western Siberia, the Volga region, Udmurtia, Komi Republic, Perm region.

Practice has shown, that the products manufactured by BITAS can successfully compete with Russian and foreign analogues in measurement accuracy and operational dependability, advantaged in low prices and fast delivery.

Within 6 years of activity there have been manufactured over 800 telesystems.

Our equipment was used for the informational and engineering drilling support of more than 4500 oil- and gas- wells. The average vertical depth -2750 m, the max vertical depth - 4200 m. The total length of the wells drilled is more than 12700 km.